Busroot Documentation
Go to OI WebsiteRequest Access to Demo Site
  • Getting Started
    • Overview
    • Concepts and Architecture
      • Station Windows
    • Account Setup
      • Users & Authentication
    • Connecting Stations
    • Glossary
    • Releases
  • Features
    • Production Tracking
    • Asset Utilisation
    • Downtime Analysis
    • Scheduling
    • OEE Analysis
    • Energy Monitoring
    • Cycle Time Analysis
    • Lost Production Cost Analysis
    • Operator Interface
    • Shop Floor LFDs
    • Email Notifications
      • Daily Summary Email
  • Configuration
    • Plants
    • Stations
    • SKUs
    • Issue Reasons
  • Integrations
    • Real-time Station Data
    • HTTP API
      • Signals
    • PowerBI Direct Access
    • Grafana Direct Access
    • Bulk Data Export
      • CSV Download
      • S3 Sync
    • Node-RED Nodes
  • Recommended Hardware
    • Arduino Opta
      • Configuration
      • Cellular Connectivity
    • Android Tablet
    • Energy Monitors
      • 1 Phase < 100A
      • 3 Phase < 100A
      • 3 Phase < 4000A
    • Fire TV Stick
    • Diagnostic Device
  • Partner Portal
    • Overview
    • Becoming a Partner
  • Archive
    • Use Busroot
      • Live Monitoring
        • Cockpit
        • Dashboards
      • Production
        • Production Monitoring
      • OEE
        • OEE Chart
        • PT vs NPT
        • Downtime Detection
        • Utilisation Monitoring
      • Admin
        • Plants
        • Stations
        • SKU Management
        • Shift Patterns
        • Notifications
      • Production Schedules
        • Schedule CSV Upload
      • Operator Tablet
        • Interruption Tool
      • Manage Your Stations
      • Alerts and Emails
    • Workflows
      • Basic Utilisation Monitoring
      • Performance Monitoring
      • Production Progress Forecasting
      • Manual Production Progress Tracking
      • Understanding Downtime Trends
      • Understanding Production Trends
      • Daily Email Summaries
      • Adhoc Production Tracking
      • Short Interval Control
      • Wasted Energy
      • Understanding Energy Consumption Trends
      • Raw Data Access
      • Understanding OEE Trends
    • FAQs
    • CUSTOMER GUIDE TO BUSROOT
      • Requirements before and during Installation
        • Pre-Installation requirements
          • Completing the Work order form
        • What hardware will you need and do we provide it?
        • Connectivity requirements to use Busroot
        • Installation
        • Self-Installation and configuration guide
      • A user guide to getting started with your account
        • Setting up your Plant
        • Login to your account
        • Station Setup
        • SKU Setup
        • Shift Patterns
        • Notifications
      • Glossary of Busroot Menu Features and how to use them
        • Menu - Overview
        • Menu - Live Monitoring
          • Production Progress
          • Cockpit
        • Menu - Production
        • Menu - Scheduling
          • Production Schedules
          • Schedule CSV Upload
        • Menu - OEE Analysis
          • PT vs NPT
          • OEE Chart
          • Utilisation Monitoring
          • Downtime Detection
        • Menu - Energy
    • Onboarding
      • Welcome
      • Getting Started
      • Implementation
      • After the installation
      • For your IT Team
Powered by GitBook

© 2025 Output Industries Ltd

On this page
  1. Archive
  2. CUSTOMER GUIDE TO BUSROOT
  3. Requirements before and during Installation

Installation

PreviousConnectivity requirements to use BusrootNextSelf-Installation and configuration guide

Last updated 7 months ago

  • If you have an in-house maintenance or engineering team we can share information to support the installation.

  • If you do not have an in-house to complete the installation we can put you in-touch with one of our installation partners to carry-out the installation.

  • We find 5 machines can be installed in one day with minimal impact to production. Machine downtime depends on entering the cabinets we need to install. Some can be entered without needing to power down the machine. If the machine does need to be powered down then a rough estimate is between 5-15 minutes.

We have prepared a guide to help you complete the machine information requested .

Should you require further specifications regarding the hardware, they can be found .

in this link
in this link