Busroot Documentation
Go to OI WebsiteRequest Access to Demo Site
  • Getting Started
    • Overview
    • Concepts and Architecture
      • Station Windows
    • Account Setup
      • Users & Authentication
    • Connecting Stations
    • Glossary
    • Releases
  • Features
    • Production Tracking
    • Asset Utilisation
    • Downtime Analysis
    • Scheduling
    • OEE Analysis
    • Energy Monitoring
    • Cycle Time Analysis
    • Lost Production Cost Analysis
    • Operator Interface
    • Shop Floor LFDs
    • Email Notifications
      • Daily Summary Email
  • Configuration
    • Plants
    • Stations
    • SKUs
    • Issue Reasons
  • Integrations
    • Real-time Station Data
    • HTTP API
      • Signals
    • PowerBI Direct Access
    • Grafana Direct Access
    • Bulk Data Export
      • CSV Download
      • S3 Sync
    • Node-RED Nodes
  • Recommended Hardware
    • Arduino Opta
      • Configuration
      • Cellular Connectivity
    • Android Tablet
    • Energy Monitors
      • 1 Phase < 100A
      • 3 Phase < 100A
      • 3 Phase < 4000A
    • Fire TV Stick
    • Diagnostic Device
  • Partner Portal
    • Overview
    • Becoming a Partner
  • Archive
    • Use Busroot
      • Live Monitoring
        • Cockpit
        • Dashboards
      • Production
        • Production Monitoring
      • OEE
        • OEE Chart
        • PT vs NPT
        • Downtime Detection
        • Utilisation Monitoring
      • Admin
        • Plants
        • Stations
        • SKU Management
        • Shift Patterns
        • Notifications
      • Production Schedules
        • Schedule CSV Upload
      • Operator Tablet
        • Interruption Tool
      • Manage Your Stations
      • Alerts and Emails
    • Workflows
      • Basic Utilisation Monitoring
      • Performance Monitoring
      • Production Progress Forecasting
      • Manual Production Progress Tracking
      • Understanding Downtime Trends
      • Understanding Production Trends
      • Daily Email Summaries
      • Adhoc Production Tracking
      • Short Interval Control
      • Wasted Energy
      • Understanding Energy Consumption Trends
      • Raw Data Access
      • Understanding OEE Trends
    • FAQs
    • CUSTOMER GUIDE TO BUSROOT
      • Requirements before and during Installation
        • Pre-Installation requirements
          • Completing the Work order form
        • What hardware will you need and do we provide it?
        • Connectivity requirements to use Busroot
        • Installation
        • Self-Installation and configuration guide
      • A user guide to getting started with your account
        • Setting up your Plant
        • Login to your account
        • Station Setup
        • SKU Setup
        • Shift Patterns
        • Notifications
      • Glossary of Busroot Menu Features and how to use them
        • Menu - Overview
        • Menu - Live Monitoring
          • Production Progress
          • Cockpit
        • Menu - Production
        • Menu - Scheduling
          • Production Schedules
          • Schedule CSV Upload
        • Menu - OEE Analysis
          • PT vs NPT
          • OEE Chart
          • Utilisation Monitoring
          • Downtime Detection
        • Menu - Energy
    • Onboarding
      • Welcome
      • Getting Started
      • Implementation
      • After the installation
      • For your IT Team
Powered by GitBook

© 2025 Output Industries Ltd

On this page
  • Overview
  • Operator initials
  • Production Complete (good/bad)
  • Assign to Station
  • Work Order Select
  1. Archive
  2. Use Busroot

Operator Tablet

Overview

For manual assembly stations or just as an immediate way to connect production to Busroot, the Operator Tablet allows input of all necessary production data directly from a station.

Operator initials

On opening the tablet each operator can enter their initials which will be logged with production data.

To switch user, press profile icon and enter new user initials.

Production Complete (good/bad)

Record both good and bad units, tapping + to add quantity for good and - for bad then Submit.

Up to the last 3 entries can be edited in the production history by selecting Undo.

Assign to Station

Assign the tablet to a work station by pressing Station change and selecting from the list, then press Select.

Work Order Select

To change work order press Schedule change and select from the list of orders available for that station.

WO Start

WO Complete

PreviousSchedule CSV UploadNextInterruption Tool

Last updated 1 year ago