# Week 15 | 2026

#### Featured Improvement: Drag & Drop on Gantt Chart

* **Drag to move** — grab a schedule and slide it left or right to change when it starts
* **Resize** — drag the start or end edge of a schedule to adjust its duration
* **Edit restrictions** — running schedules have their start time locked; completed schedules cannot be edited
* **Colour legend** — a legend above the chart shows what each bar colour means
* **Order type badges** — each production schedule shows its type (FQ, FE, FQE, C) and start/end mode (ASE, AS, AE, M)
* **Hover for details** — in the schedule detail header, hover over start or end times to see all times. Hover over order type or start/end mode badges to see their full descriptions
* **Continuous schedules** — now extend to the right edge of the visible time range

**Note** - Exact behaviour varies by schedule type. For full details see [here](https://docs.output.industries/scheduling/gantt)

<figure><img src="https://1224489259-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fi2TlO4PocWIzMF8TVNsQ%2Fuploads%2FAx4lrgke7qGSP5Y2Xof5%2FSCR-20260402-qwxl.png?alt=media&#x26;token=8c1e5dc1-c87f-45ab-bf81-96172e382cd3" alt=""><figcaption></figcaption></figure>